Zoom the image with the mouse

Velvac VEL 711167, Kit, Long Lead Camera Homerun Cabl

No reviews yet Write a Review
Part Number:
VEL/711167
Manufacturer:
Condition:
New
Shipping:
Calculated at Checkout
Now: $246.86
Was: $347.99

VEL 711167, Kit, Long Lead Camera Homerun Cabl

Adding to cart… The item has been added
VEL 711167, Kit, Long Lead Camera Homerun Cabl
Now: $246.86
Was: $347.99
Ask us anything

Ask us anything

Available 24/7
Description

VEL 711167, Kit, Long Lead Camera Homerun Cabl Specifications & Details

VEL 711167, Kit, Long Lead Camera Homerun Cabl is a premium heavy-duty truck part manufactured by Velvac. Designed for durability and performance, it is a reliable replacement component for commercial trucks and fleets.
SKU: VEL/711167

VEL 711167, Kit, Long Lead Camera Homerun Cabl

About Velvac

Velvac is a trusted manufacturer of truck parts, known for OEM-level quality and reliability across Freightliner and other leading heavy-duty trucks.

California Proposition 65 Warning California Proposition Warning Learn more.

Warranty Information

All Velvac parts sold by Duaparts include a 1-year manufacturer warranty, covering defects in materials and workmanship. For full details, please see our Warranty Policy.

Customer Reviews 0 Reviews Write a Review

This product hasn't received any reviews yet. Be the first to review this product!